Fujitsu MHN2100AT Manual/User Guide - Page 31
When the power is shut down, the controlled Normal Unload cannot be executed., Therefore
View all Fujitsu MHN2100AT manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
1.7 Reliability Emergency Unload other than Normal Unload is performed when the power is shut down while the heads are still loaded on the disk. The product supports the Emergency Unload a minimum of 20,000 times. When the power is shut down, the controlled Normal Unload cannot be executed. Therefore, the number of Emergency other than Normal Unload is specified. C141-E120-02EN 1-11
1.7
Reliability
C141-E120-02EN
1-11
Emergency Unload other than Normal Unload is performed when the power is
shut down while the heads are still loaded on the disk.
The product supports the Emergency Unload a minimum of 20,000 times.
When the power is shut down, the controlled Normal Unload cannot be executed.
Therefore, the number of Emergency other than Normal Unload is specified.