HP 10636 HP 10000 G2 Series Rack Options Installation Guide - Page 53
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top
![]() |
View all HP 10636 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 53 highlights
4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the cable access panel and tighten. From the system chassis rail to the rack top: 1. Insert a T-25 Torx screw through one end of a 15.24-cm (6-in) grounding strap, and secure it to the system chassis rail. 2. Place the other end of the same grounding strap over the grounding lug on the rack top. 3. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top and tighten. From the grounding lug on the rack top to the grounding lug on the perforated panel: 1. Place one end of a 36.83-cm (14.5-in) grounding strap over the grounding lug on the rack top. 2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top and tighten. 3. Place the other end of the same grounding strap over the grounding lug on the perforated panel. Ground Bonding kit 53
![](/manual_guide/products/hewlettpackard-10636-hp-10000-g2-series-rack-options-installation-guide-d108d9f/53.png)