HP LH4r HP Netserver LXr 8500 Rack Cabling Guide - Page 7
Site Preparation Checklist
View all HP LH4r manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Chapter 1 Preparation for Cabling the HP NetServer LXr8500 Site Preparation Checklist Table 1-1. Site Preparation Checklist HP NetServer General Guidelines Logical and physical network design provided Server configuration parameters determined Disk partition and directory structure determined Required incoming power and data cabling in place Working LAN, one working client, one working printer available (if integrating into an existing network) Software license requirements met Networking peripherals connected Floor Ensure the floor where the NetServer rack is to be installed is level Assess floor strength and ensure it is sufficient to support the type of rack you have ordered. (See the rack documentation included with your rack.) Ensure sufficient area to accommodate your rack, including up to 24 inches (600 mm) rear door clearance and 36 inches (900 mm) front door clearance. Power Correct size, type, and rating of receptacles, circuits, and circuit breakers; see the section entitled "Site Preparation: Circuit Breakers." Locate close enough to power sources so that power cords will reach If raised floor, need floor tile(s) with a cutout for cables, all posts electrically grounded Facility for grounding each rack to earth connection to ensure earth ground continuity for circuits to be used for rack mounted equipment 3