HP Latex 800 Site Preparation Guide - Page 18

Site preparation requirements

Page 18 highlights

The following grounding tasks must be fulfilled to meet the site preparation requirements: ● Grounding wires must be insulated and at least equal in size to the phase conductors. ● Ground impedance must be less than 0.5 Ω or comply with the Electrical Code requirements of the local jurisdiction of the country where the equipment is installed. 14 Chapter 2 Site preparation requirements