Table 3-3 Electrical configuration requirements Question Yes No Do you need an Uninterrupted Power Supply (UPS) or step-up transformer? If so, is it correctly installed? Comments Table 3-4 Networking and computer requirements Question Yes No Is the RIP computer and software ready for installation? Have network connections been supplied as per spec? Do you need a web proxy? If so, write down proxy server name and port. Do you have a color sensor that is compatible with your RIP? Do you have a LAN cable long enough to connect the printer to the network? Comments Table 3-5 Environmental requirements Question Yes No Have the temperature and humidity requirements been satisfactorily met in the print production area? Have the temperature and humidity requirements been satisfactorily met in the storage area? Is the print production area free from dirt and dust? Does the print production area have sufficient lighting? Have you checked and met the ventilation requirements specified in the site preparation guide? (Required) Comments Table 3-6 Other requirements Question Have you arranged for supplies such as substrate and Eco-Carton ink cartridges to be available on the day of installation? Have you met the requirements specified in this guide? Yes No Comments (Required) Table 3-7 Customer information Please enter the requested information Date of site preparation completion Site preparation guide edition number or copyright date Customer signature 16 Chapter 3 Site preparation checklist

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21

Table 3-3
Electrical configuration requirements
Question
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS) or step-up transformer?
If so, is it correctly installed?
Table 3-4
Networking and computer requirements
Question
Yes
No
Comments
Is the RIP computer and software ready for installation?
Have network connections been supplied as per spec?
Do you need a web proxy? If so, write down proxy server name and port.
Do you have a color sensor that is compatible with your RIP?
Do you have a LAN cable long enough to connect the printer to the network?
Table 3-5
Environmental requirements
Question
Yes
No
Comments
Have the temperature and humidity requirements been satisfactorily met in
the print production area?
Have the temperature and humidity requirements been satisfactorily met in
the storage area?
Is the print production area free from dirt and dust?
Does the print production area have sufficient lighting?
Have you checked and met the ventilation requirements specified in the site
preparation guide?
(Required)
Table 3-6
Other requirements
Question
Yes
No
Comments
Have you arranged for supplies such as substrate and Eco-Carton ink
cartridges to be available on the day of installation?
Have you met the requirements specified in this guide?
(Required)
Table 3-7
Customer information
Please enter the requested information
Date of site preparation completion
Site preparation guide edition number or copyright date
Customer signature