HP Rp7410 Site Preparation Guide, Second Edition - hp rp7405/rp7410 Servers - Page 55
Table 3-2, Site Inspection Checklist Continued
View all HP Rp7410 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 55 highlights
Pre-installation Survey Site Inspection Table 3-2 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date Comment or Date 6. Is the raised floor adequate for equipment loading? 7. Are there channels or cutouts for cable routing? 8. Is there a remote console telephone line available with an RJ11 jack? 9. Is a telephone line available? 10. Are customer supplied peripheral cables and LAN cables available and of the proper type? 11. Are floor tiles in good condition and properly braced? 12. Is floor tile underside shiny or painted? If painted, judge the need for particulate test. Power and lighting No. Area or condition Yes No 13. Are lighting levels adequate for maintenance? 14. Are there AC outlets available for servicing needs? (i.e. vacuuming) 15. Does the input voltage correspond to equipment specifications? 15A Is dual source power used? If so, identify type(s) and evaluate grounding. 16 Does the input frequency correspond to equipment specifications? 17. Are lightning arrestors installed inside the building? 18. Is power conditioning equipment installed? 19. Is there a dedicated branch circuit for equipment? 20. Is the dedicated branch circuit less than 250 feet (72.5 meters)? 21. Are the input circuit breakers adequate for equipment loads? Safety No. Area or condition Yes No Chapter 3 35