HP Rp7410 Site Preparation Guide, Second Edition - hp rp7405/rp7410 Servers - Page 58

Delivery Survey Part 1

Page 58 highlights

Pre-installation Survey Delivery Survey • Special security requirements applicable to the facility, such as security clearance Figure 3-1 Delivery Survey (Part 1) DELIVERY CHECKLIST DOCK DELIVERY Is dock large enough for a semitrailer? Yes No Circle the location of the dock and give street name if different than address. North West East South STREET DELIVERY Circle the location of access door and list street name if different than address. North West East List height and width South of access door. List special permits (if required) for street delivery. Permit type: Agency obtained from: 60SP018A 12/7/99 38 Chapter 3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74

Chapter 3
Pre-installation Survey
Delivery Survey
38
Special security requirements applicable to the facility, such as security clearance
Figure 3-1
Delivery Survey (Part 1)
STREET DELIVERY
and width
of access door.
North
South
West
East
South
North
West
East
DOCK DELIVERY
DELIVERY CHECKLIST
Yes
No
Is dock large enough for a semitrailer?
Circle the location of the dock and give street name if different than address.
List height
Circle the location of access door and list street name if different than address.
List special permits (if required) for street delivery.
Permit type:
Agency obtained from:
12/7/99
60SP018A