HP Rp7410 Site Preparation Guide, Second Edition - hp rp7405/rp7410 Servers - Page 59

Delivery Survey Part 2

Page 59 highlights

Figure 3-2 Delivery Survey (Part 2) Pre-installation Survey Delivery Survey ELEVATOR Fill in the following information if an elevator is required to move equipment. Capacity (lb or kg) Depth Height Width Depth Height Width STAIRS Please list number of flights and stairway dimensions. Number of flights Width Width Number of flights Width Width Width Width 60SP019A 11/24/99 Chapter 3 39

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74

Chapter 3
Pre-installation Survey
Delivery Survey
39
Figure 3-2
Delivery Survey (Part 2)
Depth
Width
Width
Width
STAIRS
Width
ELEVATOR
Height
Fill in the following information if an elevator is required to move equipment.
Capacity (lb or kg)
Please list number of flights and stairway dimensions.
Number of flights
11/24/99
60SP019A
Depth
Width
Width
Number of flights
Width
Width
Height