HP Installation Specialist Responsibilities

Page 21 highlights

Introduction HP Installation Specialist Responsibilities HP Installation Specialist Responsibilities The HP Installation Specialist is responsible for: • Unpacking the equipment • Installing the cabinets • Connecting the system to AC power • Completing the installation report Tool Requirements The following list provides the HP Installation Specialist with the recommended tools for performing the unpacking and installation process. Tools Required for Unpacking • Diagonal side cutters • Safety glasses • Ratchet handle, extension, and socket (1/2 inch) • Open end wrench (1/2 inch) • Closed end wrench (1/2 inch) Tools Required for Installation • Digital voltmeter • Open end wrench (1/2 inch) • ESD kit (wrist strap, wrist cord, ground mat, ground cord) • Cable ties • Permanent marking pen Unpacking the Equipment The HP Installation Specialist may unpack the equipment after it is located at the final installation site. Unpacking includes checking the inventory, inspecting the equipment with the customer, and removing the equipment from the containers. Save all packing material until the operational checkout of the equipment is completed. Saving all the packing material allows the equipment to be repacked for return if necessary. Installing the Cabinet To install an hp rp8400 server, the HP Installation Specialist must connect the cables between the server and the console, and if applicable, connect modems and other peripherals. Should it become necessary to troubleshoot the server during installation or later during a service call, note the following caution: Chapter 1 21

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Chapter 1
Introduction
HP Installation Specialist Responsibilities
21
HP Installation Specialist Responsibilities
The HP Installation Specialist is responsible for:
Unpacking the equipment
Installing the cabinets
Connecting the system to AC power
Completing the installation report
Tool Requirements
The following list provides the HP Installation Specialist with the recommended tools for performing the
unpacking and installation process.
Tools Required for Unpacking
Diagonal side cutters
Safety glasses
Ratchet handle, extension, and socket (1/2 inch)
Open end wrench (1/2 inch)
Closed end wrench (1/2 inch)
Tools Required for Installation
Digital voltmeter
Open end wrench (1/2 inch)
ESD kit (wrist strap, wrist cord, ground mat, ground cord)
Cable ties
Permanent marking pen
Unpacking the Equipment
The HP Installation Specialist may unpack the equipment after it is located at the final installation site.
Unpacking includes checking the inventory, inspecting the equipment with the customer, and removing the
equipment from the containers. Save all packing material until the operational checkout of the equipment is
completed. Saving all the packing material allows the equipment to be repacked for return if necessary.
Installing the Cabinet
To install an hp rp8400 server, the HP Installation Specialist must connect the cables between the server and
the console, and if applicable, connect modems and other peripherals.
Should it become necessary to troubleshoot the server during installation or later during a service call, note
the following caution: