HP rp8400 Installation Guide, Third Edition - HP rp8400 Server Series - Page 54

Safety Ground Reference Check - Single Power Source

Page 54 highlights

AC Power Wiring and Voltage Checks Safety Ground Verification (Single Power Source) This procedure measures the voltage level between A0 and A1. The voltage level between B0 and B1 will also be verified. All measurements will be taken between ground pins. Refer to Figure 4-2 for ground reference points when performing these measurements. Figure 4-2Safety Ground Reference Check - Single Power Source Step 1. Measure the voltage between A0 and A1. Take the AC voltage down to the lowest scale on the volt meter. One probe will be inserted into the ground pin for A0. The other probe will be inserted into the ground pin for A1. Verify that the measurement is between 0 - 5 volts AC. If the measurement is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server cabinet. Step 2. Measure the voltage between B0 and B1. Take the AC voltage down to the lowest scale on the volt meter. One probe will be inserted into the ground pin for B0. The other probe will be inserted into the ground pin for B1. Verify that the measurement is between 0 - 5 volts AC. If the measurement is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server cabinet. 54 Chapter 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Chapter 4
AC Power
Wiring and Voltage Checks
54
Safety Ground Verification (Single Power Source)
This procedure measures the voltage level between A0 and A1. The voltage level between B0 and
B1 will also be verified. All measurements will be taken between ground pins. Refer to Figure 4-2
for ground reference points when performing these measurements.
Figure 4-2Safety Ground Reference Check - Single Power Source
Step 1.
Measure the voltage between A0 and A1. Take the AC voltage down to the lowest scale on the volt
meter. One probe will be inserted into the ground pin for A0. The other probe will be inserted into
the ground pin for A1. Verify that the measurement is between 0 - 5 volts AC. If the measurement
is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server
cabinet.
Step 2.
Measure the voltage between B0 and B1. Take the AC voltage down to the lowest scale on the volt
meter. One probe will be inserted into the ground pin for B0. The other probe will be inserted into
the ground pin for B1. Verify that the measurement is between 0 - 5 volts AC. If the measurement
is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server
cabinet.