HP rp8400 Installation Guide, Third Edition - HP rp8400 Server Series - Page 37

Raising the Server Off the Pallet Cushions

Page 37 highlights

Unpacking Rack Mount System Installation Step 5. Slowly raise the server off the pallet until it clears the pallet cushions. Figure 3-6Raising the Server Off the Pallet Cushions Step 6. Carefully roll the lifter and server away from the pallet. Do not raise the server any higher than necessary when moving it over to the rack. Step 7. Follow the HP J1528A Rack Integration Kit Installation Guide to complete these steps: • Mounting the server to the slides • Installing the cable management arm (CMA) • Installing the interlock device assembly (if two servers are in the same cabinet) Chapter 3 37

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Chapter 3
Unpacking
Rack Mount System Installation
37
Step 5.
Slowly raise the server off the pallet until it clears the pallet cushions.
Figure 3-6Raising the Server Off the Pallet Cushions
Step 6.
Carefully roll the lifter and server away from the pallet. Do not raise the server any higher than
necessary when moving it over to the rack.
Step 7.
Follow the HP J1528A Rack Integration Kit Installation Guide to complete these steps:
Mounting the server to the slides
Installing the cable management arm (CMA)
Installing the interlock device assembly (if two servers are in the same cabinet)