HP rp8400 Installation Guide, Third Edition - HP rp8400 Server Series - Page 86

Using the Checklist - power requirements

Page 86 highlights

Installation Checklist Using the Checklist Using the Checklist The checklist provided here is an installation aid and should be used only after you have installed a few systems using the detailed procedures described in the body of this manual. This checklist is a compilation of the tasks described in this manual. The checklist is organized as follows: PROCEDURES The procedures outlined in this document in order. IN-PROCESS The portion of the checklist that allows you to comment on the current status of a procedure. COMPLETED The final check to ensure that a step has been completed and comments. Major tasks are in bold type, subtasks are indented. Table A-1 Factory-Integrated Installation Checklist PROCEDURE Initials Obtain LAN information Verify site preparation Site grounding verified Power requirements verified Check inventory Inspect shipping containers for damage Unpack SPU cabinet Allow proper clearance Cut polystrap bands Remove cardboard top cap Remove corrugated wrap from the pallet Remove four bolts holding down the ramps and remove the ramps Remove antistatic bag Check for damage (exterior and interior) Position ramps Roll cabinet off ramp IN-PROCESS Comments Initials COMPLETED Comments 86 Appendix A

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Appendix A
Installation Checklist
Using the Checklist
86
Using the Checklist
The checklist provided here is an installation aid and should be used only after you have installed a few
systems using the detailed procedures described in the body of this manual. This checklist is a compilation of
the tasks described in this manual.
The checklist is organized as follows:
PROCEDURES
The procedures outlined in this document in order.
IN-PROCESS
The portion of the checklist that allows you to comment on the current status of a procedure.
COMPLETED
The final check to ensure that a step has been completed and comments.
Major tasks are in
bold type
, subtasks are indented.
Table A-1
Factory-Integrated Installation Checklist
PROCEDURE
IN-PROCESS
COMPLETED
Initials
Comments
Initials
Comments
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements
verified
Check inventory
Inspect shipping containers
for damage
Unpack SPU cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and
remove the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp