HP rp8400 Installation Guide, Third Edition - HP rp8400 Server Series - Page 88

Appendix

Page 88 highlights

Installation Checklist Using the Checklist Table A-1 Factory-Integrated Installation Checklist (Continued) (Continued) PROCEDURE Install non-factory-integrated I/O cards (if required) Select PCI card slot Install PCI card Verify installation Route cables using the cable management arm Install other peripherals (if required) Perform visual inspection and complete installation Set up network services (if required) Enable iCOD (if available) Final inspection of circuit boards Final inspection of cabling Area cleaned and debris and packing materials disposed of Tools accounted for Parts and other items disposed of Make entry in Gold Book (recommended) Customer acceptance and signoff (if required) IN-PROCESS COMPLETED 88 Appendix A

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Appendix A
Installation Checklist
Using the Checklist
88
Install non-factory-integrated
I/O cards (if required)
Select PCI card slot
Install PCI card
Verify installation
Route cables using the cable
management arm
Install other peripherals (if
required)
Perform visual inspection and
complete installation
Set up network services (if
required)
Enable iCOD (if available)
Final inspection of circuit boards
Final inspection of cabling
Area cleaned and debris and
packing materials disposed of
Tools accounted for
Parts and other items
disposed of
Make entry in Gold Book
(recommended)
Customer acceptance and
signoff (if required)
Table A-1
Factory-Integrated Installation Checklist
(Continued) (Continued)
PROCEDURE
IN-PROCESS
COMPLETED