Installation Cleanup Checklist

Page 82 highlights

Installation Cleanup Installation Cleanup Checklist Installation Cleanup Checklist Use the following list to ensure the system is ready to be turned over to the customer. • Inspect circuit boards. Check that all circuit boards are installed and properly seated, and that the circuit board retainers are reinstalled. • Inspect cabling. Check that all cables are installed, secured, and properly routed. • Inspect test points. Check that test leads are removed from the voltage test points. • Clean up and dispose of debris. Remove all packing materials and debris from the area, and dispose of it properly. • Perform final check. Inspect the area to ensure that all parts, tools, and other items used to install the system are disposed of properly. Then, if you have not already done so, close and lock the doors. • Enter information in the Gold Book. When you complete the installation and cleanup, we recommend that you make the appropriate notations in the Gold Book, which should have been shipped with the system. • Obtain customer acceptance (if required). This includes thanking the customer for choosing Hewlett-Packard. 82 Chapter 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Chapter 6
Installation Cleanup
Installation Cleanup Checklist
82
Installation Cleanup Checklist
Use the following list to ensure the system is ready to be turned over to the customer.
Inspect circuit boards.
Check that all circuit boards are installed and properly seated, and that the
circuit board retainers are reinstalled.
Inspect cabling.
Check that all cables are installed, secured, and properly routed.
Inspect test points.
Check that test leads are removed from the voltage test points.
Clean up and dispose of debris.
Remove all packing materials and debris from the area, and dispose of
it properly.
Perform final check.
Inspect the area to ensure that all parts, tools, and other items used to install the
system are disposed of properly. Then, if you have not already done so, close and lock the doors.
Enter information in the Gold Book.
When you complete the installation and cleanup, we recommend
that you make the appropriate notations in the Gold Book, which should have been shipped with the
system.
Obtain customer acceptance (if required).
This includes thanking the customer for choosing
Hewlett-Packard.