IBM 17351GX User Guide - Page 19
Installation, Required items
![]() |
View all IBM 17351GX manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
5 CHAPTER 2 Installation Required items Before you install the appliance, make sure that you have all the required items. The following items come with the LCM2 appliance: • Power cord • One serial cable • Rack-mounting brackets • Documentation CD • Quick Installation Guide • 1-U filler panel • Eight terminators In addition to the items that come with the appliance, you must provide one CO cable (virtual media, KVM, or USB) and one Cat5 patch cable for each attached target device or appliance. A Phillips screwdriver is also needed for rack-mounting the appliance.
![](/manual_guide/products/ibm-17351gx-user-guide-d8380fd/19.png)
5
CHAPTER
2
Installation
Required items
Before you install the appliance, make sure that you have all the required items. The following
items come with the LCM2 appliance:
•
Power cord
•
One serial cable
•
Rack-mounting brackets
•
Documentation CD
•
Quick Installation Guide
•
1-U filler panel
•
Eight terminators
In addition to the items that come with the appliance, you must provide one CO cable (virtual
media, KVM, or USB) and one Cat5 patch cable for each attached target device or appliance. A
Phillips screwdriver is also needed for rack-mounting the appliance.