IBM 1735R16 User Guide - Page 18

Vertical installation in the side of a rack cabinet

Page 18 highlights

Chapter 2: Installation 11 Vertical installation in the side of a rack cabinet 1. Line up the small holes of the L-shaped brackets with the screw holes in the switch. 2. With a Phillips screwdriver, fasten the mounting brackets to the switch using two 8/32" x 1/2" pan head screws on each side. 3. Mount the switch assembly to the rack by matching the long slots on each bracket to an appropriate set of holes on your equipment rack. Next, insert a combination hex head screw through the slots in the bracket and the holes in the side brace. Cap the screw with a hex serrated flange nut and tighten. NOTE: The mounting holes on the upper and lower side braces in a rack side compartment must be between 50.8 cm (20.0 in.) and 57.3 cm (22.6 in.) apart. If your rack cabinet has movable side braces, refer to your rack documentation for information about relocating side braces if they are not already spaced for this installation. Figure 2.1: RCM Vertical Installation Horizontal installation in the 1U rack mounting space 1. Line up the holes in the "long side" of the kit's side brackets with the screw holes in the switch. 2. With a Phillips screwdriver, fasten the mounting brackets to the switch using two 8/32" x 1/2" pan head screws on each side. 3. Attach the four cage nuts or clip nuts to the rack mounting flange of the rack cabinet so that the nuts are positioned on the inside of the rack.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71

Chapter 2: Installation
11
Vertical installation in the side of a rack cabinet
1.
Line up the small holes of the L-shaped brackets with the screw holes in
the switch.
2.
With a Phillips screwdriver, fasten the mounting brackets to the switch
using two 8/32” x 1/2” pan head screws on each side.
3.
Mount the switch assembly to the rack by matching the long slots on each
bracket to an appropriate set of holes on your equipment rack. Next, insert a
combination hex head screw through the slots in the bracket and the holes in
the side brace. Cap the screw with a hex serrated flange nut and tighten.
NOTE:
The mounting holes on the upper and lower side braces in a rack side compartment
must be between 50.8 cm (20.0 in.) and 57.3 cm (22.6 in.) apart. If your rack cabinet has
movable side braces, refer to your rack documentation for information about relocating side
braces if they are not already spaced for this installation.
Figure 2.1: RCM Vertical Installation
Horizontal installation in the 1U rack mounting space
1.
Line up the holes in the “long side” of the kit’s side brackets with the
screw holes in the switch.
2.
With a Phillips screwdriver, fasten the mounting brackets to the switch
using two 8/32” x 1/2” pan head screws on each side.
3.
Attach the four cage nuts or clip nuts to the rack mounting flange of the
rack cabinet so that the nuts are positioned on the inside of the rack.