IBM 2498B24 User Guide - Page 34

Time required, Items required, Installation instructions

Page 34 highlights

v To allow the non-port side of the switch to slide out the cool-air side of the cabinet. In this installation, the port side of the switch is set 7.62 cm (3 in.) back from the edge of the cabinet, allowing a more gradual bend in the fiber optic cables. Time required Approximately 30 minutes Items required You need the following items to install the switch in a slide-rail rack: v Straight slot screwdriver v Rack space: 1 EIA unit of rack space, 48.3 cm (19 in.) wide, and 60.96 cm (24 in.) deep v One power cord that is provided with the switch v One power outlet v Rack mount kit Attention: Use the exact screws specified in the procedure for use with the switch chassis. Using screws longer than 3/16 in. can damage the switch. The different types of screws are listed in Table 3 on page 11. Note: Make sure that you tighten all screws used in this procedure. Installation instructions To install the switch in a slide-rail rack that meets EIA standards, use the following procedure. Note: These procedures use parts that are included in the rack-mount kit. These parts are listed in Table 3 on page 11. The installation procedure cross-references the items in this table. Be sure to use the referenced parts when you perform each step. Before you start the rack-mount installation process, locate the rack-mount slides and the mounting bracket that are provided in the shipping container. Figure 3 on page 11 shows the rack assembly. The number keys, such as 1 , refer to the items listed in Table 3 on page 11. 10 SAN24B-4 Express Installation, Service, and User Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77

v
To allow the non-port side of the switch to slide out the cool-air side of the
cabinet. In this installation, the port side of the switch is set 7.62 cm (3 in.) back
from the edge of the cabinet, allowing a more gradual bend in the fiber optic
cables.
Time required
Approximately 30 minutes
Items required
You need the following items to install the switch in a slide-rail rack:
v
Straight slot screwdriver
v
Rack space: 1 EIA unit of rack space, 48.3 cm (19 in.) wide, and 60.96 cm (24 in.)
deep
v
One power cord that is provided with the switch
v
One power outlet
v
Rack mount kit
Attention:
Use the exact screws specified in the procedure for use with the switch
chassis. Using screws longer than 3/16 in. can damage the switch. The different
types of screws are listed in Table 3 on page 11.
Note:
Make sure that you tighten all screws used in this procedure.
Installation instructions
To install the switch in a slide-rail rack that meets EIA standards, use the following
procedure.
Note:
These procedures use parts that are included in the rack-mount kit. These
parts are listed in Table 3 on page 11. The installation procedure
cross-references the items in this table. Be sure to use the referenced parts
when you perform each step.
Before you start the rack-mount installation process, locate the rack-mount slides
and the mounting bracket that are provided in the shipping container.
Figure 3 on page 11 shows the rack assembly. The number keys, such as
±1²
, refer
to the items listed in Table 3 on page 11.
10
SAN24B-4 Express Installation, Service, and User Guide