IBM 2498B24 User Guide - Page 34
Time required, Items required, Installation instructions
UPC - 883436031462
View all IBM 2498B24 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
v To allow the non-port side of the switch to slide out the cool-air side of the cabinet. In this installation, the port side of the switch is set 7.62 cm (3 in.) back from the edge of the cabinet, allowing a more gradual bend in the fiber optic cables. Time required Approximately 30 minutes Items required You need the following items to install the switch in a slide-rail rack: v Straight slot screwdriver v Rack space: 1 EIA unit of rack space, 48.3 cm (19 in.) wide, and 60.96 cm (24 in.) deep v One power cord that is provided with the switch v One power outlet v Rack mount kit Attention: Use the exact screws specified in the procedure for use with the switch chassis. Using screws longer than 3/16 in. can damage the switch. The different types of screws are listed in Table 3 on page 11. Note: Make sure that you tighten all screws used in this procedure. Installation instructions To install the switch in a slide-rail rack that meets EIA standards, use the following procedure. Note: These procedures use parts that are included in the rack-mount kit. These parts are listed in Table 3 on page 11. The installation procedure cross-references the items in this table. Be sure to use the referenced parts when you perform each step. Before you start the rack-mount installation process, locate the rack-mount slides and the mounting bracket that are provided in the shipping container. Figure 3 on page 11 shows the rack assembly. The number keys, such as 1 , refer to the items listed in Table 3 on page 11. 10 SAN24B-4 Express Installation, Service, and User Guide