IBM 2498B24 User Guide - Page 38
Repeat step 6a and step 6b for the other rail., see
![]() |
UPC - 883436031462
View all IBM 2498B24 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 38 highlights
4 12 11 10 1 5 9 4 3 SJ000048 Figure 6. Mounting the fixed portion of the rail and the locking brackets to the rack 6. Install the outer (larger) slides in the rack, as shown in Figure 6. a. At the desired height, install the five M5 nut clips 5 . Put three M5 nut clips in the front of the rack and two in the back. The middle clip in the front of the rack is for the locking ears. Note: Some rack mount kits might use 10-32 nut clips in place of the M5 nut clips for the locking ears. b. Attach the slides by using four M5 x 12 screws 7 (see Figure 3 on page 11). c. Repeat step 6a and step 6b for the other rail. 7. Install the switch in the rack. a. Position the switch in front of the rack. Insert the switch into the rack by sliding the inner slides that are mounted on the switch into the outer slides that are mounted on the rack. See Figure 7 on page 15. 14 SAN24B-4 Express Installation, Service, and User Guide
![](/manual_guide/products/ibm-2498b24-user-guide-d96de74/38.png)