Intel H2000JF System Service Guide - Page 53
Installing and Removing the Node Power Docking Board
![]() |
View all Intel H2000JF manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 53 highlights
Hardware Installations and Upgrades Figure 61. Connecting Mini SAS Cable to Bridge Board Installing and Removing the Node Power Docking Board Removing the NPD Board 1. Disconnect all cables from the NPD board. 2. Remove the four screws to release the NPD board from tray base. 3. Straightly lift up the NPD board to remove from the tray base. Figure 62. Removing the NPD Board Installing the NPD Board 1. Place the NPD board into the tray base. 2. Secure the NPD board with four screws. 3. Connect all cables between NPD board and server board. 40 Intel® Server System H2000JF Family Service Guide
![](/manual_guide/products/intel-h2000jf-service-guide-e35e84f/53.png)
Hardware Installations and Upgrades
40
Intel
®
Server System H2000JF Family Service Guide
Figure 61. Connecting Mini SAS Cable to Bridge Board
Installing and Removing the Node Power Docking Board
Removing the NPD Board
1.
Disconnect all cables from the NPD board.
2.
Remove the four screws to release the NPD board from tray base.
3.
Straightly lift up the NPD board to remove from the tray base.
Figure 62. Removing the NPD Board
Installing the NPD Board
1.
Place the NPD board into the tray base.
2.
Secure the NPD board with four screws.
3.
Connect all cables between NPD board and server board.