Intel SR2520SAFNA User Guide - Page 43
Hardware Installations and, Upgrades
![]() |
UPC - 735858191036
View all Intel SR2520SAFNA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 43 highlights
3 Hardware Installations and Upgrades Before You Begin Before working with your server product, pay close attention to the "Safety Information" at the beginning of this manual. Tools and Supplies Needed • Phillips* (cross head) screwdrivers (#1 bit and #2 bit) • Needle nosed pliers • Antistatic wrist strap and conductive foam pad (recommended) System References All references to left, right, front, top, and bottom assume the reader is facing the front of the server system as it would be positioned for normal operation. Removing and Installing from a Rack Two Intel® rack options are available to install the Intel® Server System SR2520SA in a rack. The options are the fixed bracket kit and the basic rail kit. Note: Follow all safety guidelines while removing a system from a rack to avoid injury. Fixed Bracket Rack Mount Removal 1. Disconnect all cables from the back of the system. Note: Remember to use the system LED to properly identify the system you are servicing. 2. Remove screws from the brackets and remove the system from the rack.
![](/manual_guide/products/intel-sr2520sax-user-guide-9131fdb/43.png)