LevelOne WAC-1000 User Manual - Page 46

AP centralized management configuration instance

Page 46 highlights

9.5 AP centralized management configuration instance Requirements: A small business now bought three sets of AP, and wants to set up a wireless network within the company, and must meet the following requirements: 1) The wireless network can cover the whole office area of the company. 2) With this wireless network, the company employees can use wireless terminals to access to the enterprise's internal resources and the Internet, while outsiders can only use the wireless terminals to access to the Internet, but cannot access to the enterprise's internal resources. 3) The number of clients on three APs should be as consistent as possible. Analysis: 1) To achieve the coverage of wireless network in the whole office area: Install the three APs in the corresponding office area reasonably, to realize a seamless connection through the two-layer roaming. 2) Create two service areas on the WAC-1000 / WAC-1001, one for the company's employees, and the other for outsiders. And three sets of AP are added into these two service areas (to achieve 2-layer roaming of wireless network), to enable the corresponding personnel to access to network resources in any position of the office area through the wireless network. 3) Add three APs into the same load balancing group on WAC-1000 / WAC-1001, to realize load balancing between the APs. 4) Prevent outsiders from accessing to the internal resources by making a strategy on WAC-1000 / WAC-1001. 42

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79

42
9.5 AP centralized management configuration instance
Requirements:
A small business now bought three sets of AP, and wants to set up a wireless network within the company, and
must meet the following requirements:
1) The wireless network can cover the whole office area of the company.
2) With this wireless network, the company employees can use wireless terminals to access to the enterprise's
internal resources and the Internet, while outsiders can only use the wireless terminals to access to the Internet,
but cannot access to the enterprise
s internal resources.
3) The number of clients on three APs should be as consistent as possible.
Analysis:
1) To achieve the coverage of wireless network in the whole office area: Install the three APs in the
corresponding office area reasonably, to realize a seamless connection through the two-layer roaming.
2) Create two service areas on the WAC-1000 / WAC-1001, one for the company's employees, and the other for
outsiders. And three sets of AP are added into these two service areas (to achieve 2-layer roaming of wireless
network), to enable the corresponding personnel to access to network resources in any position of the office area
through the wireless network.
3) Add three APs into the same load balancing group on WAC-1000 / WAC-1001, to realize load balancing
between the APs.
4) Prevent outsiders from accessing to the internal resources by making a strategy on WAC-1000 / WAC-1001.