Netgear SW510 Installation Guide - Page 24

Installing a Switch, Installing the Switch on a Flat Surface - instructions

Page 24 highlights

Installation Guide for the Model SW510 and Model SW518 Ethernet Switches Call your reseller or customer support in your area if there are any wrong, missing, or damaged parts. Refer to page iii for the location of customer support in your area. Keep the carton, including the original packing materials. Use them to repack the switch if you need to return it for repair. To qualify for product updates and product warranty registration, fill in the Warranty and Owner Registration Card within 30 days of purchase and return it to NETGEAR, Inc. Installing a Switch To install a switch on a desktop, on another flat surface, or in a rack, follow these steps: 1. Unpack the switch. 2. Choose a location near the devices to be connected and close to an electrical outlet. 3. Proceed to "Installing the Switch on a Flat Surface" or "Installing the Switch in a Rack." Installing the Switch on a Flat Surface To install the switch on a desktop or any other flat surface, follow these steps: 1. Install the self-adhesive rubber pads on the bottom of the switch. Peel off the protective backing from the rubber pads and apply one at each marked location on the bottom of the switch. 2. Set the switch on a desktop or any other flat surface. For proper ventilation, make sure that the switch has at least 2 inches of space on each side and 5 inches of space at the back. It is very important that the fans located in the rear panel are not blocked. Restricted airflow could cause overheating of the components. 3. Install any additional devices in your stack. For instructions on connecting to additional switches or other devices, refer to "Connecting Devices to the Switch" later in this chapter. 4-2 Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Installation Guide for the Model SW510 and Model SW518 Ethernet Switches
4-2
Installation
Call your reseller or customer support in your area if there are any wrong, missing, or damaged
parts. Refer to
page
iii
for the location of customer support in your area.
Keep the carton, including the original packing materials. Use them to repack the switch if you
need to return it for repair.
To qualify for product updates and product warranty registration, fill in the Warranty and Owner
Registration Card within 30 days of purchase and return it to NETGEAR, Inc.
Installing a Switch
To install a switch on a desktop, on another flat surface, or in a rack, follow these steps:
1.
Unpack the switch.
2.
Choose a location near the devices to be connected and close to an electrical outlet.
3.
Proceed to
Installing the Switch on a Flat Surface
” or
Installing the Switch in a Rack
.”
Installing the Switch on a Flat Surface
To install the switch on a desktop or any other flat surface, follow these steps:
1.
Install the self-adhesive rubber pads on the bottom of the switch.
Peel off the protective backing from the rubber pads and apply one at each marked location on
the bottom of the switch.
2.
Set the switch on a desktop or any other flat surface.
For proper ventilation, make sure that the switch has at least 2 inches of space on each side and
5 inches of space at the back. It is very important that the fans located in the rear panel are not
blocked. Restricted airflow could cause overheating of the components.
3.
Install any additional devices in your stack.
For instructions on connecting to additional switches or other devices, refer to
“Connecting
De
vices to the Switch
later in this chapter.