Netgear SW510 Installation Guide - Page 36

Table B-1 lists the pin assignments for the RJ-45 plug and the vista RJ-45 connector.

Page 36 highlights

Installation Guide for the Model SW510 and Model SW518 Ethernet Switches Table B-1 lists the pin assignments for the RJ-45 plug and the vista RJ-45 connector. Table 5-1. connector Pin 1 2 3 6 4, 5, 7, 8 Pin assignments for the RJ-45 plug and vista RJ-45 Normal assignment Input Receive Data + Input Receive Data - Output Transmit Data + Output Transmit Data - Not Used Uplink assignment Output Transmit Data + Output Transmit Data - Input Receive Data + Input Receive Data - Not Used B-2 Connector Pin Assignments

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Installation Guide for the Model SW510 and Model SW518 Ethernet Switches
B-2
Connector Pin Assignments
Table B-1 lists the pin assignments for the RJ-45 plug and the vista RJ-45 connector.
Table 5-1.
Pin assignments for the RJ-45 plug and vista RJ-45
connector
Pin
Normal assignment
Uplink assignment
1
Input Receive Data +
Output Transmit Data +
2
Input Receive Data –
Output Transmit Data –
3
Output Transmit Data +
Input Receive Data +
6
Output Transmit Data –
Input Receive Data –
4, 5, 7, 8
Not Used
Not Used