Netgear SW510 Installation Guide - Page 36
Table B-1 lists the pin assignments for the RJ-45 plug and the vista RJ-45 connector.
![]() |
UPC - 606449000955
View all Netgear SW510 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
Installation Guide for the Model SW510 and Model SW518 Ethernet Switches Table B-1 lists the pin assignments for the RJ-45 plug and the vista RJ-45 connector. Table 5-1. connector Pin 1 2 3 6 4, 5, 7, 8 Pin assignments for the RJ-45 plug and vista RJ-45 Normal assignment Input Receive Data + Input Receive Data - Output Transmit Data + Output Transmit Data - Not Used Uplink assignment Output Transmit Data + Output Transmit Data - Input Receive Data + Input Receive Data - Not Used B-2 Connector Pin Assignments
![](/manual_guide/products/netgear-sw510-installation-guide-6d6c886/36.png)
Installation Guide for the Model SW510 and Model SW518 Ethernet Switches
B-2
Connector Pin Assignments
Table B-1 lists the pin assignments for the RJ-45 plug and the vista RJ-45 connector.
Table 5-1.
Pin assignments for the RJ-45 plug and vista RJ-45
connector
Pin
Normal assignment
Uplink assignment
1
Input Receive Data +
Output Transmit Data +
2
Input Receive Data –
Output Transmit Data –
3
Output Transmit Data +
Input Receive Data +
6
Output Transmit Data –
Input Receive Data –
4, 5, 7, 8
Not Used
Not Used