Panasonic KY-R647 Operating and Installation Instructions - Page 26
Installation Instructions, Installation Requirements
View all Panasonic KY-R647 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Installation Instructions For Installer Installation Requirements Cut out the work surface according to the sizes shown in the drawing. For the purpose of installation and use, a minimum of 5 cm (1 31/32 in.) space shall be preserved around the hole. Be sure the thickness of the work surface is at least 30 mm (1 3/16 in.). Please select heat-resistant work surface material to avoid larger deformation caused by the heat radiation from the Induction Hob. L W H X B X X A X Seal D L W H D A B X 590 mm 520 mm 60 mm 56 mm 568 ± 2 mm 492 ± 2 mm 50 mm (Minimum) 23 15/64 in. 20 15/32 in. 2 23/64 in. 2 13/64 in. 22 23/64 ± 5/64 in. 19 3/8 1 31/32 in. ± 5/64 in. (Minimum) EN-24
EN-24
Installation Instructions
Installation Requirements
Cut out the work surface according to the sizes shown in the drawing.
For the purpose of installation and use, a minimum of 5 cm (1 31/32 in.) space shall be
preserved around the hole. Be sure the thickness of the work surface is at least 30 mm
(1 3/16 in.). Please select heat-resistant work surface material to avoid larger deformation
caused by the heat radiation from the Induction Hob.
L
W
X
X
X
X
A
B
H
D
Seal
L
W
H
D
A
B
X
590 mm
520 mm
60 mm
56 mm
568 ± 2 mm
492 ± 2 mm
50 mm
(Minimum)
23 15/64 in.
20 15/32 in.
2 23/64 in.
2 13/64 in.
22
23
/
64
±
5
/
64
in.
19 3/8
± 5/64 in.
1 31/32 in.
(Minimum)
For Installer