When you select program I, the machine will run all steps as the order of S - L, also can choose any step from S - L by press STEP key then the machine will start to run from this step. 1. Operation S step: The PHASE on the display screen displays "HEAT", the default power is 100%, the temperature can be self-set 30°C-100°C, the default strike temperature is 71°C. The strike temperature is the temperature at which the water is heated before the malt is put in. No timing settings. After the operation is completed, ve alarm sounds are issued. 2. Operation M1-M5 step: The PHASE on the display screen shows "MASH", the power can be self-set 10%-100%, the temperature can be self-set 30-100°C, and the timing can be self-set 0-999 minutes. The speci c default value is shown in the table above. Three alarm sounds are issued after each M step is completed and enter next step. 3. Operation L step: The PHASE onthe display screen shows "LAUTER", the power can be self-set 10%-100%, the temperature can be self-set 30-100°C, and the timing can be self-set 0-999 minutes. L default power 60%, default temperature 78°C, default timing 10 minutes. After the operation is completed, ve alarm sounds are issued, and then the machine is shut down. B. The operation of the selection program II (PROG display II only) When you select program II, the machine will run the steps as the order of B1 - B3 automatically, also can choose any step from B1 to B3 by pressing STEP key then the machine will start to run backward from this step. Operation B1-B3 step: The PHASE on the display screen shows "BOIL", power can be self-set 10%-100%, temperature can be self-set 30-100°C, timing can be self-set 0-999 minutes. The default power is 100% before 100°C and 80% after 100°C. The default temperature is 100°C/212°F. The default timing is 45 minutes for B1, 10 minutes for B2 and 5 minutes for B3. B1-B3 stage without keeping warm, the wattage will keep at 80% power to keep boiling after the temperature reach 100°C/212°F. After each B step is completed and start next step operation, three alarm sounds will be issued. After B3 operation is nished, ve alarm sounds will be issued and the machine will be shut down. 10 www.NutrichefKitchen.com

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

www.NutrichefKitchen.com
10
When you select program I, the machine will run all steps as the order of S - L, also can choose any step
from S - L by press STEP key then the machine will start to run from this step.
1.
Operation S step:
The PHASE on the display screen displays "
HEAT
", the default power is 100%, the
temperature can be self-set 30°C-100°C, the default strike temperature is 71°C. The strike temperature
is the temperature at which the water is heated before the malt is put in. No timing settings.
After the operation is completed, five alarm sounds are issued.
2.
Operation M1-M5 step:
The PHASE on the display screen shows "
MASH
", the power can be self-set
10%-100%, the temperature can be self-set 30-100°C, and the timing can be self-set 0-999 minutes.
The specific default value is shown in the table above. Three alarm sounds are issued after each M step
is completed and enter next step.
3.
Operation L step:
The PHASE onthe display screen shows "
LAUTER
", the power can be self-set 10%-100%,
the temperature can be self-set 30-100°C, and the timing can be self-set 0-999 minutes. L default power
60%, default temperature 78°C, default timing 10 minutes. After the operation is completed, five alarm
sounds are issued, and then the machine is shut down.
B.
The operation of the selection program II (PROG display II only)
When you select program II, the machine will run the steps as the order of B1 - B3 automatically, also can
choose any step from B1 to B3 by pressing STEP key then the machine will start to run backward from this
step.
Operation B1-B3 step:
The PHASE on the display screen shows "
BOIL
", power can be self-set 10%-100%,
temperature can be self-set 30-100°C, timing can be self-set 0-999 minutes. The default power is 100%
before 100°C and 80% after 100°C. The default temperature is 100°C/212°F. The default timing is 45
minutes for B1, 10 minutes for B2 and 5 minutes for B3. B1-B3 stage without keeping warm, the wattage
will keep at 80% power to keep boiling after the temperature reach 100°C/212°F.
After each B step is completed and start next step operation, three alarm sounds will be issued.
After B3 operation is finished, five alarm sounds will be issued and the machine will be shut down.