TP-Link T2600G-52TS TL-SG3452 T2600G-52TS V1 Installation Guide - Page 22

Verify Installation

Page 22 highlights

Gigabit L2 Managed Switch Console(RJ45) T2600-28TS Figure 4-4 Connecting the Console (RJ-45) Port Connect the Console (USB) port of the device with your computer by the USB cable as the following figure shows. Console(USB) T2600-28TS Figure 4-5 Connecting the Console (USB) Port You can also manage the device through the console port, for details please refer to the CLI Reference Guide on the resource CD. Note: ■■ Console (RJ-45) port and Console (USB) port cannot be used cocurrently. Console (USB) port takes priority over the Console (RJ-45) port. ■■ Please keep the device power off when plugging the cable. ■■ Do not connect the console port with other ports by RJ45 cable. 4.4 Verify Installation After completing the installation, please verify the following items: ■■ There are 5~10cm of clearance around the sides of the device for ventilation and the air flow is adequate. ■■ The voltage of the power supply meets the requirement of the input voltage of the device. ■■ The power socket, device and rack are well grounded. ■■ The device is correctly connected to other network devices. 16 Connection

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

16
Connection
Figure 4-4
Connecting the Console (RJ-45) Port
Connect the Console (USB) port of the device with your computer by the USB cable as
the following figure shows.
Console(USB)
Figure 4-5
Connecting the Console (USB) Port
You can also manage the device through the console port, for details please refer to the
CLI Reference Guide on the resource CD.
Note:
Console (RJ-45) port and Console (USB) port cannot be used cocurrently. Console
(USB) port takes priority over the Console (RJ-45) port.
Please keep the device power off when plugging the cable.
Do not connect the console port with other ports by RJ45 cable.
4.4 Verify Installation
After completing the installation, please verify the following items:
There are 5~10cm of clearance around the sides of the device for ventilation and the
air flow is adequate.
The voltage of the power supply meets the requirement of the input voltage of the
device.
The power socket, device and rack are well grounded.
The device is correctly connected to other network devices.
Console(RJ45)