Weider 150 English Manual - Page 8

Plate

Page 8 highlights

5. Slide the Weight Carriage (15) onto the Upper Lat Tower (41). The Weight Carriage must be turned as shown. Press a 2 1/2" Square Bushing (16) into the Carriage Stop (52). Slide the Square Bushing and the Carriage Stop onto the Upper Lat Tower (41). Align the holes in the Carriage Stop with the indicated hole in the Upper Lat Tower. Insert an M8 x 54mm Bolt (6) through the Carriage Stop and the Upper Lat Tower. Tighten an M8 Nylon Locknut (1) onto the Bolt. Slide the Upper Lat Tower (41) onto the Lower Lat Tower (23). The Upper Lat Tower must be turned as shown. Insert an M8 x 54mm Bolt (6) through the Connector Plate (19), the Upper Lat Tower, and the Cross Brace (43). Tighten an M8 Nylon Locknut (1) onto the Bolt. Tighten all the Nylon Locknuts used in steps 1, 2, 4, and 5 now. 5 15 16 152 1 4 6. Attach the indicated end of the Cable (10) to the M8 Eyebolt (13). Feed the Cable up through the indicated hole in the Upper Lat Tower (41). Wrap the Cable (10) around a Pulley (9). Attach the Pulley inside the Upper Lat Tower (41) with an M10 x 54mm Bolt (8), two M10 Washers (7), two 1/2" x 3/8" Spacers (11), and an M10 Nylon Locknut (2). 6 11 9 8 41 41 Align these Holes 6 19 23 2 7 The plastic sleeve should be on this end of the Cable -10 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

5.
Slide
the
Weight
Carriage
(15)
onto
the
Upper
Lat
Tower
(41).
The
Weight
Carriage
must
be
turned
as
shown.
Press
a
2
1/2"
Square
Bushing
(16)
into
the
Carriage
Stop
(52).
Slide
the
Square
Bushing
and
the
Carriage
Stop
onto
the
Upper
Lat
Tower
(41).
Align
the
holes
in
the
Carriage
Stop
with
the
indicated
hole
in
the
Upper
Lat
Tower.
Insert
an
M8
x
54mm
Bolt
(6)
through
the
Carriage
Stop
and
the
Upper
Lat
Tower.
Tighten
an
M8
Nylon
Locknut
(1)
onto
the
Bolt.
Slide
the
Upper
Lat
Tower
(41)
onto
the
Lower
Lat
Tower
(23).
The
Upper
Lat
Tower
must
be
turned
as
shown.
Insert
an
M8
x
54mm
Bolt
(6)
through
the
Connector
Plate
(19),
the
Upper
Lat
Tower,
and
the
Cross
Brace
(43).
Tighten
an
M8
Nylon
Locknut
(1)
onto
the
Bolt.
Tighten
all
the
Nylon
Locknuts
used
in
steps
1,
2,
4,
and
5
now.
6.
Attach
the
indicated
end
of
the
Cable
(10)
to
the
M8
Eyebolt
(13).
Feed
the
Cable
up
through
the
indi-
cated
hole
in
the
Upper
Lat
Tower
(41).
Wrap
the
Cable
(10)
around
a
Pulley
(9).
Attach
the
Pulley
inside
the
Upper
Lat
Tower
(41)
with
an
M10
x
54mm
Bolt
(8),
two
M10
Washers
(7),
two
1/2"
x
3/8"
Spacers
(11),
and
an
M10
Nylon
Locknut
(2).
5
4
15
16
1-
52
1
41
19
23
6
Align
these
Holes
6
11
9
8
41
7
—10
13
2
The
plastic
sleeve
should
be
on
this
end
of
the
Cable