Weider Pro 3750 User Manual - Page 18

Locate the Low Cable 86.

Page 18 highlights

43. Route the High Cable (85) under a 90mm Pulley (82). Attach the Pulley and a Cable Trap (80) to the single hole end of the Pulley Plates (31) with an M10 x 48mm Bolt (50) and the M10 Nylon Locknut (42). Make sure that the Cable Trap is positioned to hold the Cable in place. 44. Wrap the High Cable (85) around a 90mm Pulley (82). Attach the Pulley to the Top Frame (2) with an M10 x 48mm Bolt (50) and an M10 Nylon Locknut (42). The Cable must be routed from the direction shown. 43 85 82 50 End with two 80 holes should be down 31 44 42 2 50 82 85 45. Attach the High Cable (85) to a Small "U"-bracket (32) with an M8 Nylon Locknut (40) and an M8 Washer (20). Do not completely tighten the Locknut. It should be threaded onto the end of the Cable so that two threads show past the Locknut (see the inset drawing). Attach the Small "U"-bracket (32) to the indicated Weight Tube (25) with an M8 x 45mm Bolt (68) and an M8 Nylon Locknut (40). 46. Locate the Low Cable (86). Wrap the Low Cable over a 90mm Pulley (82). Attach the Pulley and both Pulley Covers (94) to the Ab Upright (1) with the M10 x 97mm Bolt (95), two M10 Washers (38), and an M10 Nylon Locknut (42). Do not overtighten the Locknut; the Pulley should turn easily. Make sure that the Cable is between the Pulley and the post, and that the Pulley Covers are turned so the wide tabs are on the indicated side. 45 32 32 68 85 20 40 85 40 20 40 25 46 42 38 94 82 Post Wide tabs must be on this 86 side 95 94 38 1 18

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

18
43. Route the High Cable (85) under a 90mm Pulley
(82). Attach the Pulley and a Cable Trap (80) to
the single hole end of the Pulley Plates (31) with
an M10 x 48mm Bolt (50) and the M10 Nylon
Locknut (42).
Make sure that the Cable Trap is
positioned to hold the Cable in place.
44. Wrap the High Cable (85) around a 90mm Pulley
(82). Attach the Pulley to the Top Frame (2) with
an M10 x 48mm Bolt (50) and an M10 Nylon
Locknut (42).
The Cable must be routed from
the direction shown.
45. Attach the High Cable (85) to a Small ā€œUā€-bracket
(32) with an M8 Nylon Locknut (40) and an M8
Washer (20).
Do not completely tighten the
Locknut. It should be threaded onto the end of
the Cable so that two threads show past the
Locknut (see the inset drawing).
Attach the Small ā€œUā€-bracket (32) to the indicated
Weight Tube (25) with an M8 x 45mm Bolt (68)
and an M8 Nylon Locknut (40).
46.
Locate the Low Cable (86).
Wrap the Low Cable
over a 90mm Pulley (82). Attach the Pulley and
both Pulley Covers (94) to the Ab Upright (1) with
the M10 x 97mm Bolt (95), two M10 Washers
(38), and an M10 Nylon Locknut (42).
Do not
overtighten the Locknut; the Pulley should
turn easily. Make sure that the Cable is
between the Pulley and the post, and that the
Pulley Covers are turned so the wide tabs are
on the indicated side.
46
43
44
45
85
80
50
31
42
Post
1
86
Wide
tabs
must be
on this
side
38
38
95
94
94
82
End with two
holes should
be down
50
82
2
42
32
68
85
40
20
40
25
85
40
32
20
82
85