Weider Pro 4900 English Manual - Page 13

Cable Assembly

Page 13 highlights

Cable Assembly 22. Refer to the CABLE DIAGRAMS on pages 27 and 28 as you assemble the cables and to identify the cables. Locate the Lat Cable (71). Route the Cable up through the Right Top Frame (7) and over a 90mm Pulley (39). Make sure the Cable is between the Pulley and the rod in the Top Frame. Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (111), two M10 Washers (116), two 19mm Spacers (77), and an M10 Nylon Locknut (114). 23. Route the Lat Cable (71) over a 90mm Pulley (39) and down through the Right Top Frame (7). Make sure the Cable is between the Pulley and the rod in the Top Frame. Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (111), two M10 Washers (116), two 19mm Spacers (77), and an M10 Nylon Locknut (114). 24. Wrap the Lat Cable (71) under a 90mm Pulley (39). Attach the Pulley, a Small Cable Trap (48), and two Half Finger Guards (42) at the second hole from the top of the two Pulley Plates (51) with an M10 x 52mm Bolt (102) and an M10 Nylon Locknut (114). Make sure the Cable Trap and Finger Guards are oriented as shown. 22 71 116 39 77 7 111 77 116 114 23 116 39 111 77 Rod 71 7 77 116 114 24 71 114 42 51 39 42 48 51 102 25. Route the Lat Cable (71) up through the Right 25 Top Frame (7) and over a 90mm Pulley (39). Make sure the Cable is between the Pulley and the rod in the Top Frame. Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (111), two M10 Washers (116), two 19mm Spacers (77), and an M10 Nylon Locknut (114). 111 39 116 77 71 7 116 77 114 26. Wrap the Lat Cable (71) around a 115mm Pulley 26 (41). Attach the Pulley and a Large Cable Trap (125) to the Right Top Frame (7) with an M10 x 110mm Bolt (73) and an M10 Nylon Locknut (114). 73 71 125 41 114 7 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

13
25. Route the Lat Cable (71) up through the Right
Top Frame (7) and over a 90mm Pulley (39).
Make sure the Cable is between the Pulley
and the rod in the Top Frame.
Attach the Pulley
inside the Top Frame with an M10 x 80mm Bolt
(111), two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut (114).
26. Wrap the Lat Cable (71) around a 115mm Pulley
(41). Attach the Pulley and a Large Cable Trap
(125) to the Right Top Frame (7) with an M10 x
110mm Bolt (73) and an M10 Nylon Locknut
(114).
22
111
111
39
71
77
116
116
114
77
7
23
24
25
26
77
116
114
102
42
51
48
51
39
114
39
71
77
116
116
114
77
7
71
41
7
125
73
114
116
77
7
39
Rod
71
71
111
22.
Refer to the CABLE DIAGRAMS on pages 27
and 28 as you assemble the cables and to
identify the cables.
Locate the Lat Cable (71).
Route the Cable up
through the Right Top Frame (7) and over a
90mm Pulley (39).
Make sure the Cable is
between the Pulley and the rod in the Top
Frame.
Attach the Pulley inside the Top Frame
with an M10 x 80mm Bolt (111), two M10
Washers (116), two 19mm Spacers (77), and an
M10 Nylon Locknut (114).
23. Route the Lat Cable (71) over a 90mm Pulley
(39) and down through the Right Top Frame (7).
Make sure the Cable is between the Pulley
and the rod in the Top Frame.
Attach the Pulley
inside the Top Frame with an M10 x 80mm Bolt
(111), two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut (114).
24. Wrap the Lat Cable (71) under a 90mm Pulley
(39). Attach the Pulley, a Small Cable Trap (48),
and two Half Finger Guards (42) at the second
hole from the top of the two Pulley Plates (51)
with an M10 x 52mm Bolt (102) and an M10
Nylon Locknut (114).
Make sure the Cable Trap
and Finger Guards are oriented as shown.
Cable Assembly
42