Weider Pro 4900 English Manual - Page 18

Locate the Right Stack Cable 68. - weight set

Page 18 highlights

46. Set an M12 Washer (129) on top of the Short 46 Weight Tube (123). Thread an M12 Nut (128) all the way onto the Leg Lever Cable (70). Thread the Leg Lever Cable (70) into the Short Weight Tube (123). Tighten the M12 Nut (128) against the M12 Washer (129). 47. Locate the Right Stack Cable (68). Attach the 47 Cable to the Left Top Frame (8) with an M8 x 80mm Bolt (94), an M8 Washer (117), and an M8 Nylon Locknut (115). 48. Wrap the Right Stack Cable (68) under a 90mm 48 Pulley (39). Attach the Pulley, a Small Cable Trap (48), and two Half Finger Guards (42) to the upper hole in the indicated "U"-bracket (50) with an M10 x 52mm Bolt (102) and an M10 Nylon Locknut (114). Make sure the Cable Trap and Finger Guards are oriented as shown. 49. Wrap the Right Stack Cable (68) over a "V"-pulley 49 (40). Attach the "V"-pulley and a Cable Trap (49) to the Left Top Frame (8) with an M10 x 55mm Bolt (137) and an M10 Nylon Locknut (114). Make sure the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 50. Wrap the Right Stack Cable (68) around a 90mm 50 Pulley (39). Attach the Pulley and a Small Cable Trap (48) to the Right Top Frame (7) with an M10 x 110mm Bolt (73) and an M10 Nylon Locknut (114). 18 70 128 129 123 94 8 68 117 115 42 39 68 48 42 114 50 102 114 8 68 40 49 137 73 48 39 68 7 114

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

18
46. Set an M12 Washer (129) on top of the Short
Weight Tube (123). Thread an M12 Nut (128) all
the way onto the Leg Lever Cable (70).
Thread the Leg Lever Cable (70) into the Short
Weight Tube (123). Tighten the M12 Nut (128)
against the M12 Washer (129).
47.
Locate the Right Stack Cable (68).
Attach the
Cable to the Left Top Frame (8) with an M8 x
80mm Bolt (94), an M8 Washer (117), and an M8
Nylon Locknut (115).
48. Wrap the Right Stack Cable (68) under a 90mm
Pulley (39). Attach the Pulley, a Small Cable Trap
(48), and two Half Finger Guards (42) to the
upper hole in the indicated “U”-bracket (50) with
an M10 x 52mm Bolt (102) and an M10 Nylon
Locknut (114).
Make sure the Cable Trap and
Finger Guards are oriented as shown.
49. Wrap the Right Stack Cable (68) over a “V”-pulley
(40). Attach the “V”-pulley and a Cable Trap (49)
to the Left Top Frame (8) with an M10 x 55mm
Bolt (137) and an M10 Nylon Locknut (114).
Make sure the Cable Trap is oriented to hold
the Cable in the groove of the Pulley.
50. Wrap the Right Stack Cable (68) around a 90mm
Pulley (39). Attach the Pulley and a Small Cable
Trap (48) to the Right Top Frame (7) with an M10
x 110mm Bolt (73) and an M10 Nylon Locknut
(114).
46
70
128
129
123
47
94
68
117
115
8
48
50
42
48
102
114
8
114
42
68
39
49
68
40
49
137
50
73
48
39
68
7
114