Weider Pro 7500 Uk Manual - Page 22

Make sure the Cable Trap

Page 22 highlights

46. Insert a 90mm Pulley (48) into the Front Leg (10) from the indicated direction. Attach the 46 Pulley to the Front Leg with an M10 x 68mm Bolt (85), two M10 Washers (80), two 13mm Steel Spacers (109) and an M10 Nylon Locknut (77). 85 80 109 10 48 51 109 80 77 47. Route the Leg Lever Cable (51) under the indicated bars on the Right Base (1). Then, wrap 47 the Cable under a 90mm Pulley (48). Attach the Pulley to the Right Base with an M10 x 50mm Bolt (97), two Half Guards (55), and an M10 Nylon Locknut (77). Make sure the Half Guards are oriented as shown. 55 51 97 Bar 48 55 77 48. Wrap the Leg Lever Cable (51) over a 90mm 48 Pulley (48). Attach the Pulley, a Cable Trap (56), and two Half Guards (55) to the second hole from the bottom of the Pulley Plates (60) with an M10 x 50mm Bolt (97) and an M10 Nylon Locknut (77). Make sure the Cable Trap and the Half Guards are oriented as shown. 49. Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley to the Right Base 49 (1) with an M10 x 50mm Bolt (97), two Half Guards (55), and an M10 Nylon Locknut (77). Make sure the Half Guards are oriented as shown. 22 1 77 55 60 56 48 51 55 97 51 48 97 55 55 1 77

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

22
46
47
85
80
109
109
10
80
77
48
55
51
55
Bar
1
77
97
48
51
48
77
55
56
51
55
97
48
60
49. Wrap the Leg Lever Cable (51) under a 90mm
Pulley (48). Attach the Pulley to the Right Base
(1) with an M10 x 50mm Bolt (97), two Half
Guards (55), and an M10 Nylon Locknut (77).
Make sure the Half Guards are oriented as
shown.
49
77
48
51
55
1
55
97
46. Insert a 90mm Pulley (48) into the Front Leg
(10) from the indicated direction. Attach the
Pulley to the Front Leg with an M10 x 68mm
Bolt (85), two M10 Washers (80), two 13mm
Steel Spacers (109) and an M10 Nylon Locknut
(77).
47. Route the Leg Lever Cable (51) under the indi-
cated bars on the Right Base (1). Then, wrap
the Cable under a 90mm Pulley (48). Attach the
Pulley to the Right Base with an M10 x 50mm
Bolt (97), two Half Guards (55), and an M10
Nylon Locknut (77).
Make sure the Half
Guards are oriented as shown.
48. Wrap the Leg Lever Cable (51) over a 90mm
Pulley (48). Attach the Pulley, a Cable Trap
(56), and two Half Guards (55) to the second
hole from the bottom of the Pulley Plates (60)
with an M10 x 50mm Bolt (97) and an M10
Nylon Locknut (77).
Make sure the Cable Trap
and the Half Guards are oriented as shown.