Weider Pro 7500 Uk Manual - Page 23
Pulley 48. Attach the Pulley to the Double U
View all Weider Pro 7500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
50. Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley to the Right Base 50 (1) with an M10 x 50mm Bolt (97), two Half Guards (55), and an M10 Nylon Locknut (77). Make sure the Half Guards are oriented as shown. 51. Wrap the Leg Lever Cable (51) over a 90mm Pulley (48). Attach the Pulley to the Double "U" 51 -bracket (61) with an M10 x 50mm Bolt (97), two Half Guards (55), and an M10 Nylon Locknut (77). Make sure the Half Guards are oriented as shown. 97 55 51 48 1 55 77 97 55 51 61 77 55 48 52. Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley and a Cable Trap 52 (56) to the Right Upright (2) with an M10 x 120mm Bolt (115), two Guards (54), an M10 51 115 48 Washer (80), and an M10 Nylon Locknut (77). Tighten the Nylon Locknut only two turns. Make sure the Cable Trap is oriented as shown. 54 80 2 56 54 77 53. Wrap the Leg Lever Cable (51) under a 90mm 53 Pulley (48). Attach the Pulley and a Cable Trap (56) to the Right Press Arm (16) with an M10 x 50mm Bolt (97), two Half Guards (55), an M10 Washer (80), and an M10 Nylon Locknut (77). Make sure the Cable Trap is oriented as shown. 51 77 48 55 80 56 97 55 16 23