Bowflex Xtreme 2 SE Assembly Manual - Page 23

Cable and Pulley Routing, Connect Cable End Stop Ball with Core

Page 23 highlights

Assembly Guide Step 19b Cable and Pulley Routing - Connect Cable End Stop Ball with Core Figure 19b - Detail Step 19c Cable and Pulley Routing - Connect Rod Cables through Left (3) Floating and Lat Tower Pulleys 19-4 R epeat with Left Rod Cable and (3) and (8) Floating Pulleys, as shown in Figure 19c. Note: O nce the Cable End Stop Balls are attached, hook each Rod Hook onto the Lat Pulley Housing as shown in Figure 19d. Figure 19c 5 4 2 3 Figure 19d - Rod Hooks Storage on Lat Pulley Housing Bowflex Xtreme® 2 SE Assembly Manual 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

Bowflex Xtreme
®
2 SE Assembly Manual
19
Assembly Guide
Figure 19b - Detail
Step 19b
Cable and Pulley Routing –
Connect Cable End Stop Ball with Core
Step 19c
Cable and Pulley Routing –
Connect Rod Cables through Left (3) Floating
and Lat Tower Pulleys
19-4
Repeat with Left Rod Cable and (3) and (8)
Floating Pulleys, as shown in
Figure 19c
°
Note:
Once the Cable End Stop Balls are attached,
hook each Rod Hook onto the Lat Pulley
Housing as shown in
Figure 19d
°
5
4
3
2
Figure 19d - Rod Hooks Storage on Lat Pulley
Housing
Figure 19c