Brother International BAS-342G Basic Instruction Manual - English - Page 23
Securing the cords and air tubes [10], INSTALLATION, Checking the cords
View all Brother International BAS-342G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
4-15. Securing the cords and air tubes [10] Leg Control box Table 4. INSTALLATION Secure the air tubes (a), the solenoid valve assembly cord (b) and the operation panel cord (c) together underneath the table with the three cord holders (1). (1) Cord holders [3 pcs.] (2) Wood screws [3 pcs.] Operation panel Solenoid valve assembly 3981M 3982M 1. Gently tilt back the machine head. (Refer to "4-5. Tilting back and returning the machine head".) 2. Check that none of the cords are being pulled. 3. Return the machine head to its original position. 4. Close the cord presser plate (3) in the direction of the arrow, and secure it by tightening the two screws (4). NOTE: Tighten the cord presser plate (3) securely so that no foreign objects or small animals can get inside the control box. 5. Secure the cover of the control box by tightening the eight screws (5). Check that the cords are not clamped by the cover at this time. BAS-342G 15