Brother International LK3-B431 MKII Instruction Manual - Page 17

Installing, control

Page 17 highlights

3-4 . Installing the control box LK3-6430E Mark II { LK3-6432E Mark II LK3-6433E Mark II o 0 e=3 0) 3. INSTALLATION mm • 0 =I Table Cushions °Cushion collars Rubber collers 8 Flat washers Nuts O [LK3-B431E Mark II] e8 NIN O 1. Remove the 12 screws 0, and then open the covers (panel mounting assembly 0 and main P.C. board mounting plate 0). NOTE: When opening the cover, hold it securely so that it does not fall down. 2. Install the control box with the four accessory bolts 0, cushions 0, cushion collars 0, rubber collars 0, flat washers 0 and nuts 0 as shown in the illustration above. At this time, leave a gap of approximately 3 mm between the work table and the top of the box. * Use two nuts 0 at each installation location, and make sure that both nuts are tightened. 3. Close the covers (panel mounting assembly 0 and main P-C- board mounting plate 0), and tighten them with the screws 0. * The main P.C. board mounting plate 0 will be opened again during "3-13. Connecting the cords", so provisionally tighten it with the screw 0. 4. Install the power switch ID with the two screws fa e. 5. Secure the power switch cord with the three staples ID. 6. Pass the motor cord through the cord hole LK3-B430E-, 6431E-, 8432E-, 6433E- Mark II 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76

3.
INSTALLATION
3-4
.
Installing
the
control
box
{
LK3-6430E
Mark
II
LK3-6432E
Mark
II
LK3-6433E
Mark
II
0)
[LK3-B431E
Mark
II]
NIN
0
o
e=3
O
O
e
8
Table
Cushions
°Cushion
collars
mm
Rubber
collers
Flat
washers
Nuts
8
1.
Remove
the
12
screws
0,
and
then
open
the
covers
(panel
mounting
assembly
0
and
main
P.C.
board
mounting
plate
0).
NOTE:
When
opening
the
cover,
hold
it
securely
so
that
it
does
not
fall
down.
2.
Install
the
control
box
with
the
four
accessory
bolts
0,
cushions
0,
cushion
collars
0,
rubber
collars
0,
flat
washers
0
and
nuts
0
as
shown
in
the
illustration
above.
At
this
time,
leave
a
gap
of
approximately
3
mm
between
the
work
table
and
the
top
of
the
box.
*
Use
two
nuts
0
at
each
installation
location,
and
make
sure
that
both
nuts
are
tightened.
3.
Close
the
covers
(panel
mounting
assembly
0
and
main
P
-C-
board
mounting
plate
0),
and
tighten
them
with
the
screws
0.
*
The
main
P.C.
board
mounting
plate
0
will
be
opened
again
during
"3-13.
Connecting
the
cords",
so
provisionally
tighten
it
with
the
screw
0.
4.
Install
the
power
switch
ID
with
the
two
screws
fa
5.
Secure
the
power
switch
cord
with
the
three
staples
ID.
6.
Pass
the
motor
cord
through
the
cord
hole
e.
LK3-B430E-,
6431
E-,
8432E-,
6433E-
Mark
II
10