Gateway NV-59C Service Guide - Page 79
Removing the Power Board, See Removing the Upper Cover
View all Gateway NV-59C manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 79 highlights
Removing the Power Board 1. See "Removing the Upper Cover" on page 62. 2. Turn the upper cover over. Pass the cable through the upper cover as shown. 3. Remove two (2) screws from the power board. Step Power board Size M2*3 Quantity 2 Screw Type 4. Remove the power board assembly and lift the power board clear of the device. Chapter 3 69
Chapter 3
69
Removing the Power Board
1.
See “Removing the Upper Cover” on page 62.
2.
Turn the upper cover over. Pass the cable through the upper cover as shown.
3.
Remove two (2) screws from the power board.
4.
Remove the power board assembly and lift the power board clear of the device.
Step
Size
Quantity
Screw Type
Power board
M2*3
2