GE NX-8 Installation Manual - Page 59

BOARD INSTALLATION, Diagram 1, Diagram 2, Diagram 3, IMPORTANT, WARNING - installation manual

Page 59 highlights

BOARD INSTALLATION Inside the can, several 2-holed insertion points have been constructed. This allows for either vertical or horizontal placement of the modules. Notice that each insertion point has two sizes of holes a larger hole and a smaller hole. Diagram 1: The black plastic PCB guides are grooved on one edge where the PC board will be seated. The end with the half-moon protrusion fits into the larger hole. The smaller hole is for the screw. Diagram 2: Place the first black plastic PCB guide in the top insertion point, grooved edge downward. The half-moon protrusion will be in the large hole. It does not require force. Insert one of the provided screw into the smaller hole (from inside the can) to secure it in place. A screwdriver should reach through the notch that runs the length of the guide to tighten the screw. The second PBC guide should be positioned opposite the first (grooved edge up) and placed in the lower insertion point, using the same procedures described above. Once mounted, screw it in securely. Diagram 3: The PC Board should slide freely in the grooves of both guides. K IMPORTANT! 1. If separate power supplies are necessary to accommodate additional devices, safety standards require that each power supply be prominently marked with adequate instructions for removing all power from the unit. 2. Dispose of used batteries according to the manufacturer's instructions and/or local government authorities. 3. Installation personnel should thoroughly read and understand the installation instructions and the users manuals for the panel and all the accessories to be included with the system before attempting to install a security system. WARNING! Replace only with Panasonic #LC12V4BP or Yuasa #NP4-12 battery. Observe polarity when installing a new battery. Installing the battery backwards may cause damage to the panel. There is a risk of explosion if the battery is replaced with an incorrect type. NOTE Electrical codes will vary depending upon the country and city where the system is installed. It is the installer's responsibility to ensure that the electrical installation is safe and conforms to all applicable codes, laws, or regulations. Only qualified persons should connect this device to the mains supply. Page 59

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61

Page 59
BOARD INSTALLATION
Inside
the
can,
several
2-holed
insertion
points
have
been
constructed. This allows for either vertical or horizontal placement of
the modules. Notice that each insertion point has two sizes of holes -
a larger hole and a smaller hole.
Diagram 1
: The black plastic PCB guides are grooved on one edge
where the PC board will be seated.
The end with the half-moon
protrusion fits into the larger hole. The smaller hole is for the screw.
Diagram 2
: Place the
first
black plastic PCB guide in the top insertion
point, grooved edge downward. The half-moon protrusion will be in
the large hole. It does not require force. Insert one of the provided
screw into the smaller hole (from inside the can) to secure it in place.
A screwdriver should reach through the notch that runs the length of
the guide to tighten the screw. The
second
PBC guide should be
positioned opposite the first (grooved edge up) and placed in the
lower insertion point, using the same procedures described above.
Once mounted, screw it in securely.
Diagram 3
: The PC Board should slide freely in the grooves of both
guides.
K
IMPORTANT!
1.
If separate power supplies are necessary to accommodate additional devices, safety
standards require that each power supply be prominently marked with adequate instructions
for removing all power from the unit.
2.
Dispose of used batteries according to the manufacturer’s instructions and/or local
government authorities.
3.
Installation personnel should thoroughly read and understand the installation instructions and
the users manuals for the panel and all the accessories to be included with the system
before attempting to install a security system.
±
WARNING!
Replace only with Panasonic #LC12V4BP or Yuasa #NP4-12 battery. Observe polarity when
installing a new battery. Installing the battery backwards may cause damage to the panel. There
is a risk of explosion if the battery is replaced with an incorrect type.
NOTE
Electrical codes will vary depending upon the country and city where the system is installed. It is
the installer’s responsibility to ensure that the electrical installation is safe and conforms to all
applicable codes, laws, or regulations. Only qualified persons should connect this device to the
mains supply.