Haier AV16NMVERA Design Manual - Page 111
´×äÈÏÐÍÇÇÍÐÆËÈ ÎÇÍÄÅ ËÖ ÉÍÐÅÝÍÞ, ÎáÈÄÐáÓÅÔ ÕÞ ÐÊÅ ÝÆÓÅÏ ÆÈ ÐÊÅ ÅÇÅÄÐÓÆÄ ÕËâ×, ËáÐÔËËÓ
View all Haier AV16NMVERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 111 highlights
2. Gateway exterior appearance & installation method G R U P A d.o.o. No. item Remarks 1 AC 2 AC 13.8V, non-polar 3 NC 4 NC 5 5V When ammeter connects external power supply, 6 GND there should be a resistor 10K between 5 and 7 7 M1 8 GND 9 SUB1 Signal of slave unit 1 10 GND 11 SUB2 Signal of slave unit 2 12 GND 13 SUB3 Signal of slave unit 3 14 GND 15 HB1 Communication bus line between indoor and 16 HB2 outdoor 17 LONA Communication bus line of LonWorks 18 LONB 19 LONA 20 LONB B.Installation place of gateway Install the gateway near the master unit, because the gateway gets HOMEBUS data and slave data from outdoor inverter master unit(KMR-280W/BP), you could install the unit as follows: Install the gateway on the cover of the electrical box right side of Master unit, drilling a hole on the site. Adopt the flat head tapping screw to fix the gateway, to prevent the wires punctured by the wires in the electric box. 111