HP 3PAR StoreServ 7450 4-node HP 3PAR StoreServ 7450 Storage Installation Guid - Page 18

Removing the Brackets, Verifying Setup and Powering On the Storage System

Page 18 highlights

Removing the Brackets Remove the cable restraint shipping brackets only when the cabinet is in its final location. 1. Remove the data cables from the hook and loop straps. 2. Loosen the captive screws (see Figure 16 (page 18). Figure 16 Loosening the Captive Screws 3. Remove the brackets. Be careful not to damage the attached data cables. Now continue on to "Verifying Setup and Powering On the Storage System" (page 37) and verify setup before powering on the storage system and initializing the SP and storage system software. 18 Setting Up a Factory-Integrated Storage System

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95

Removing the Brackets
Remove the cable restraint shipping brackets only when the cabinet is in its final location.
1.
Remove the data cables from the hook and loop straps.
2.
Loosen the captive screws (see
Figure 16 (page 18)
.
Figure 16 Loosening the Captive Screws
3.
Remove the brackets. Be careful not to damage the attached data cables.
Now continue on to
“Verifying Setup and Powering On the Storage System” (page 37)
and verify
setup before powering on the storage system and initializing the SP and storage system software.
18
Setting Up a Factory-Integrated Storage System