Hitachi DS10DFL Service Manual - Page 22
Precautions on Disassembly and Reassembly of Battery Charger, Screw tightening torques
UPC - 717709014695
View all Hitachi DS10DFL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
Checks after reassembly After reassembly, install the battery and then check component operations as follows: (1) Checking the direction of rotation Press the (R) side of Pushing Button (A) [32], and check that Drill Chuck 10MM [2] rotates in the clockwise direction (when viewed from the rear of the main body). (In case of reverse rotation, the soldered connections of the internal wires of Motor DC12V [28] and DC-Speed Control Switch [35] are inverse.) (2) Checking LED operation Turn the trigger of DC-Speed Control Switch [35] on and off, and check that the LED goes on and off. (The LED goes on when the trigger is turned on; the LED goes off when the trigger is turned off.) (3) Checking shift knob operation Set Shift Knob [33] to "HIGH" (high-speed rotation) and "LOW" (low-speed rotation), and check that rotation speed is switched correctly without any abnormal noise being generated by the gears or other parts. Screw tightening torques x Special Screw (Left Hand) (B) M5 X 25 [1 2.9 to 3.9N•m{30 to 40kgf•cm} x Drill Chuck 10MM [2 12.7 to 16.7N•m{130 to 170kgf•cm} x Tapping Screw (W/Flange) D3 X 16 (Black) [38 0.8 to 1.2N•m{8 to 12kgf•cm} x Machine Screw M3 X 8 [26 0.63 to 0.93N•m{6.5 to 9.5kgf•cm} x Screw Set D2 X 3.5 [17 0.3 to 0.5N•m{3 to 5kgf•cm} 2. Precautions on Disassembly and Reassembly of Battery Charger For precaution on the disassembly and reassembly of the charger (Model UC 10SFL), and other chargerrelated precautions, refer to the Service Manual for the Model UC 10SFL. -19-