LG ARUN096BT2 Installation Manual - Page 19
Foundation for Installation
View all LG ARUN096BT2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
Installation Foundation for Installation • Fix the unit tightly with bolts as shown below so that unit will not fall down due to earthquake or gust. • Use the H-beam support as a base support • Noise and vibration may occur from the floor or wall since vibration is transferred through the installation part depending on installation status. Thus, use anti-vibration materials (cushion pad) fully (The base pad shall be more than 200mm). ENGLISH A Ensure that the corner part can be securely mounted. Otherwise, the support for installation may be bent. B Obtain and use the M10 anchor bolt. C The corner was not properly mounted. D Outdoor unit (Insert the cushion pad between outdoor unit and base support to ensure that anti-vibration may be done in a wide area) G E Pipe and wiring space (in case of piping and wiring on the floor surface) F H-Beam support G Concrete base support WARNING • Be sure to install unit in a place strong enough to withstand its weight. Any lack of strength may cause unit to fall down, resulting in a personal injury. • Have installation work in order to protect against a strong wind and earthquake. Any installation deficiency may cause unit to fall down, resulting in a personal injury. • Especially take care for support strength of the floor surface, water drain processing (processing of water flown out from the outdoor unit during operation) and paths of the pipe and wiring when making a base support. • Don't use a tube or pipe for water drain in the base pan and perform water drain processing by using the drain path. Water drain may not be done due to freezing of a tube or pipe. Rear view Side view Water Drain Path Installation Manual 19