Sanyo WXU300 Instruction Manuals, PLC-WXU300 - Page 52
Power management, Ready, Shut down, Timer, signal, Ready: 5 min, Standby mode, Network
UPC - 086483074226
View all Sanyo WXU300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 52 highlights
Setting Standby mode This function is available when operating the projector via network. Network..... Supply the power to the network function even after turning off the projector. You can turn on/ off the projector via network, modify network environment, and receive an e-mail about projector status while the projector is powered off. Eco Select Eco when you do not use the projector via network. The projector's network function will stop when turning off the projector. Refer to the owner's manual of "Network Set-up and Operation". Note: • Factory default is Eco. • When selecting Network, the cooling fans may be running depending on the temperature inside the projector even if the projector is turned off. Power management For reducing power consumption as well as maintaining the lamp life, the Power management function turns off the projection lamp when the projector is not operated for a certain period. Select one of the following options: Ready When the lamp has been fully cooled down, the POWER indicator changes to green blinking. In this condition, the projection lamp will be turned on if the input signal is reconnected or any button on the top control or remote control is pressed. Shut down........... When the lamp has been fully cooled down, the power will be turned off. Off Power management function is off. Timer If the input signal is interrupted and no button is pressed for more than 30 seconds, the timer display with No signal appears. It starts the countdown until the lamp is turned off. Use the Point ▲▼ buttons to set the Timer(1~30min). Note: Factory default is Ready: 5 min. Power management Timer left before Lamp is off. 52