Toshiba UT1A1A010C6 User Guide - Page 27

Connectivity options Remote Contact, SNMP/WEB card

Page 27 highlights

• The total demand of the protected system shall dictate the output power rating (VA). Allow a margin for future expansion or calculation inaccuracies from measuring power requirements. • Backup time needed will determine the battery size needed. If the load is less than the UPS nominal power rating then the actual backup time will be longer. • The following options are available: • External Battery Cabinets • Connectivity options (Remote Contact, SNMP/WEB card) The following UPS models are available. Model UPS 1000VA UPS 1500VA UPS 2000VA UPS 3000VA Backup time Internal batteries 7 min 6 min 6 min 5 min Recharge time to 90% capacity 4 hours 4 hours 4 hours 4 hours Additional External Battery Cabinets are available if more back-up time is needed. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51

5
The total demand of the protected system shall dictate the output power rating (VA).
Allow a margin for future expansion or calculation inaccuracies from measuring
power requirements.
Backup time needed will determine the battery size needed. If the load is less than
the UPS nominal power rating then the actual backup time will be longer.
The following options are available:
External Battery Cabinets
Connectivity options (Remote Contact, SNMP/WEB card)
The following UPS models are available.
Model
Backup time Internal
batteries
Recharge time to 90%
capacity
UPS 1000VA
7 min
4 hours
UPS 1500VA
6 min
4 hours
UPS 2000VA
6 min
4 hours
UPS 3000VA
5 min
4 hours
Additional External Battery Cabinets are available if more back-up time is needed.