Bosch B18IF800SP Installation Instructions - Page 19

Attaching the fixation strips to the door panel, edge of the appliance door to the door panel

Page 19 highlights

7. Screw on the adjusting rail tightly. en-us 3. Transfer the middle drill holes along the outer edge of the appliance door to the door panel and mark. Note: ■ Attach the adjusting rail to the door panel with at least 10 screws. One screw should be inserted under each double threaded bolt. ■ The adjusting rail features a variety of holes for the many different design options of door panels. ■ Always screw into the best load-bearing material of the door panel. 8. Attaching the fixation strips to the door panel Note: The fixation strips are pre-assembled for stainless steel doors. In this case continue with the next installation step ("C / 9. Attaching the door panel"). 1. Hang the door panel on the double threaded bolt (a). 2. Align the door panel with the double threaded bolts (Torx screwdriver). Re-examine the dimensions of the gap continuously. Use the height adjustment gauge (b). 4. Remove the door panel. 5. Using the positioning aid, mark the vertical sides of the door panel parallel. 6. Using a square, extend the drill hole marks which you have just made to the vertical marks. 7. Apply the fixation strip and mark out the holes. 8. Pre-drill the holes. 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84

en-us
19
7.
Screw on the adjusting rail tightly.
Note:
Attach the adjusting rail to the door panel with at
least 10 screws. One screw should be inserted
under each double threaded bolt.
The adjusting rail features a variety of holes for the
many different design options of door panels.
Always screw into the best load-bearing material
of the door panel.
8.
Attaching the fixation strips to the
door panel
Note:
The fixation strips are pre-assembled for stainless steel
doors. In this case continue with the next installation
step (“C / 9. Attaching the door panel”).
1.
Hang the door panel on the double threaded
bolt (
a
).
2.
Align the door panel with the double threaded
bolts (Torx screwdriver).
Re-examine the dimensions of the gap
continuously.
Use the height adjustment gauge (
b
).
3.
Transfer the middle drill holes along the outer
edge of the appliance door to the door panel and
mark.
4.
Remove the door panel.
5.
Using the positioning aid, mark the vertical sides
of the door panel parallel.
6.
Using a square, extend the drill hole marks which
you have just made to the vertical marks.
7.
Apply the fixation strip and mark out the holes.
8.
Pre-drill the holes.