D-Link DMS-3130-30TS Product Manual - Page 24

Plug the AC power cord into the power socket of the Switch.

Page 24 highlights

DMS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide Figure 3-5 Insert Tie Wrap into the Switch 2. Plug the AC power cord into the power socket of the Switch. Figure 3-6 Connect the power cord to the Switch 3. Slide the retainer through the tie wrap until the end of the cord. Figure 3-7 Slide the Retainer through the Tie Wrap 24

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

DMS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
24
Figure 3-5 Insert Tie Wrap into the Switch
2.
Plug the AC power cord into the power socket of the Switch.
Figure 3-6 Connect the power cord to the Switch
3.
Slide the retainer through the tie wrap until the end of the cord.
Figure 3-7 Slide the Retainer through the Tie Wrap