3 Site Location and Preparation The S6000 is suitable for installation as part of a common bond network (CBN). It can be installed in: • Network telecommunication facilities • Data centers • Other locations where the national electric code (NEC) applies This chapter contains the following sections regarding where and how you can install the S6000: • Site Selection • Cabinet Placement • Rack Mount • Ground • Fans and Airflow • Power • Storing Components NOTE: Install the S6000 switch into a rack or cabinet before installing any optional components. Site Location and Preparation | 17
Site Location and Preparation
|
17
3
Site Location and Preparation
The S6000 is suitable for installation as part of a common bond network (CBN). It can be installed in:
•
Network telecommunication facilities
•
Data centers
•
Other locations where the national electric code (NEC) applies
This chapter contains the following sections regarding where and how you can install the S6000:
•
Site Selection
•
Cabinet Placement
•
Rack Mount
•
Ground
•
Fans and Airflow
•
Power
•
Storing Components
NOTE:
Install the S6000 switch into a rack or cabinet before installing any optional components.