3 Site Location and Preparation The S6000 is suitable for installation as part of a common bond network (CBN). It can be installed in: • Network telecommunication facilities • Data centers • Other locations where the national electric code (NEC) applies This chapter contains the following sections regarding where and how you can install the S6000: • Site Selection • Cabinet Placement • Rack Mount • Ground • Fans and Airflow • Power • Storing Components NOTE: Install the S6000 switch into a rack or cabinet before installing any optional components. Site Location and Preparation | 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

Site Location and Preparation
|
17
3
Site Location and Preparation
The S6000 is suitable for installation as part of a common bond network (CBN). It can be installed in:
Network telecommunication facilities
Data centers
Other locations where the national electric code (NEC) applies
This chapter contains the following sections regarding where and how you can install the S6000:
Site Selection
Cabinet Placement
Rack Mount
Ground
Fans and Airflow
Power
Storing Components
NOTE:
Install the S6000 switch into a rack or cabinet before installing any optional components.