Dell Force10 S6000 Installation Guide - Page 22

Unpacking Steps, Install Rack or Cabinet Hardware, Rack Mount Safety Considerations

Page 22 highlights

www.dell.com | support.dell.com • If an AC switch, at least one AC power cord (country/region specific) • If a DC switch, at least one DC power cable • Getting Started Guide • Safety and Regulatory Information • Warranty and Support Information • Software License Agreement Unpacking Steps 1 Place the container on a clean, flat surface and cut all straps securing the container. 2 Open the container or remove the container top. 3 Carefully remove the switch from the container and place it on a secure and clean surface. 4 Remove all packing material. 5 Inspect the product and accessories for damage. Install Rack or Cabinet Hardware You may either place the switch on the rack shelf or mount the switch directly into a 19" wide, EIA-310E- compliant rack (four-post, two-post, or threaded methods). The Dell ReadyRails™ switch is provided for one 1U front-rack and two-post installations. The ReadyRails switch includes two separately packaged rail assemblies and two rails that are shipped attached to the sides of the switch. WARNING: This is a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory information booklet before you begin. NOTE: The illustrations in this document are not intended to represent a specific switch. NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace. Rack Mount Safety Considerations • Rack loading - Overloading or uneven loading of racks may result in shelf or rack failure, causing damage to the equipment and possible personal injury. Stabilize racks in a permanent location before loading begins. Mount the components beginning at the bottom of the rack, then work to the top. Do not exceed your rack load rating. • Power considerations - Connect only to the power source specified on the unit. When multiple electrical components are installed in a rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock hazards. • Elevated ambient temperature - If installed in a closed rack assembly, the operating temperature of the rack environment may be greater than the room ambient temperature. Use care not to exceed the 40°C maximum ambient temperature of the switch. 22 | Install the S6000

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

22
|
Install the S6000
www.dell.com | support.dell.com
If an AC switch, at least one AC power cord (country/region specific)
If a DC switch, at least one DC power cable
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement
Unpacking Steps
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
Install Rack or Cabinet Hardware
You may either place the switch on the rack shelf or mount the switch directly into a 19" wide, EIA-310-
E- compliant rack (four-post, two-post, or threaded methods). The Dell ReadyRails™ switch is provided
for one 1U front-rack and two-post installations. The ReadyRails switch includes two separately
packaged rail assemblies and two rails that are shipped attached to the sides of the switch.
WARNING:
This is a condensed reference. Read the safety instructions in your Safety, Environmental, and
Regulatory information booklet before you begin.
NOTE:
The illustrations in this document are not intended to represent a specific switch.
NOTE:
Do not the use the mounted Ready-Rails as a shelf or a workplace.
Rack Mount Safety Considerations
Rack loading
Overloading or uneven loading of racks may result in shelf or rack failure, causing
damage to the equipment and possible personal injury. Stabilize racks in a permanent location before
loading begins. Mount the components beginning at the bottom of the rack, then work to the top. Do not
exceed your rack load rating.
Power considerations
Connect only to the power source specified on the unit. When multiple
electrical components are installed in a rack, ensure that the total component power ratings do not
exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock
hazards.
Elevated ambient temperature
If installed in a closed rack assembly, the operating temperature of
the rack environment may be greater than the room ambient temperature. Use care not to exceed the
40
°
C maximum ambient temperature of the switch.