Dell Force10 S6000 Installation Guide - Page 26

Con a Four-Post Thread, Four-Post Threaded Configuration

Page 26 highlights

www.dell.com | support.dell.com Configure a Four-Post Thread Step Task 1 For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. To remove the two screws from each flange ear and remove each casting, use a Torx driver. Refer to Figure , item 1. Retain the castings for future rack requirements. 2 For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer to Figure , item 2. Figure 4-4. Four-Post Threaded Configuration 26 | Install the S6000

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

26
|
Install the S6000
www.dell.com | support.dell.com
Configure a Four-Post Thread
Step
Task
1
For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. To remove the
two screws from each flange ear and remove each casting, use a Torx driver. Refer to
Figure
, item 1. Retain the
castings for future rack requirements.
2
For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer
to
Figure
, item 2.
Figure 4-4.
Four-Post Threaded Configuration