Dell PowerEdge M520 Dell 10 Gb Ethernet Pass Through-k  for M1000e So - Page 25

Resolving a Link Protocol Mismatch, Resolving CLI Connectivity Problems, Recovery From Non-

Page 25 highlights

Rev 1.00 chassisaction -m switch- powercycle where is the switch number [1-6]. 5.3 Resolving a Link Protocol Mismatch Log in to 10GbE PTM CLI and run the "show port link" command. Check the status of the down- link and uplink in the relevant port to identify the mismatch - see Section 3.7.2 for details. 5.4 Resolving CLI Connectivity Problems Reboot the 10GbE PTM through the CMC CLI using the following command: chassisaction -m switch- powercycle where is the switch number [1-6]. 5.5 Recovery From Non-Responsive 10GbE PTM CLI Reboot the 10GbE PTM through the CMC CLI using the following command: chassisaction -m switch- powercycle where is the switch number [1-6]. 5.6 Recovery From a Software Update Failure 1. Reboot the 10GbE PTM through the CMC CLI using the following command: chassisaction -m switch- powercycle where is the switch number [1-6]. 2. Restart the software update process. 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25

Rev 1.00
25
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
5.3
Resolving a Link Protocol Mismatch
Log in to 10GbE PTM CLI and run the “show port link” command. Check the status of the down-
link and uplink in the relevant port to identify the mismatch – see
Section 3.7.2
for details.
5.4
Resolving CLI Connectivity Problems
Reboot the 10GbE PTM through the CMC CLI using the following command:
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
5.5
Recovery From Non-Responsive 10GbE PTM CLI
Reboot the 10GbE PTM through the CMC CLI using the following command:
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
5.6
Recovery From a Software Update Failure
1.
Reboot the 10GbE PTM through the CMC CLI using the following command:
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
2.
Restart the software update process.