Dell PowerEdge PDU Metered LCD User Manual - Page 36
To install the coupling brackets on the racks, hook the brackets into
![]() |
View all Dell PowerEdge PDU Metered LCD manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
5 Install the coupling brackets. a Position the two racks side by side. b Adjust the leveling feet on both racks so that the racks are parallel and in the same horizontal plane. For instructions, see "Adjusting the Leveling Feet" on page 24. c To install the coupling brackets on the racks, hook the brackets into the square holes inside and adjacent to the rack posts, and tighten the brackets using the wingnuts (see Figure 1-21). Figure 1-21. Coupling Two Racks 1 3 2 1 coupling bracket locations 3 coupling bracket (4) 2 wingnut 34 Installation Guide
![](/manual_guide/products/dell-poweredge-2410-4ec43ad/36.png)
34
Installation Guide
5
Install the coupling brackets.
a
Position the two racks side by side.
b
Adjust the leveling feet on both racks so that the racks are parallel
and in the same horizontal plane. For instructions, see "Adjusting the
Leveling Feet" on page 24.
c
To install the coupling brackets on the racks, hook the brackets into
the square holes inside and adjacent to the rack posts, and tighten the
brackets using the wingnuts (see Figure 1-21).
Figure 1-21.
Coupling Two Racks
1
coupling bracket locations
2
wingnut
3
coupling bracket (4)
1
3
2